Mia

9. tammi 20231 min

ORNAMENTTI, osa 9


Knit the s on needle 1 onto needle 4. Turn. Purl across 30 s. Turn. Knit today's chart. The heel portion is knitted flat. The turning point is marked with a red line in the pattern.

After knitting chart, pick up 16 s on each side of the heel.
 
Knit 5 s in order to move the starting point to the center of the heel. You now have a total of 75 s. Distribute 19/18/19/19.


    7180
    2